A13 Improvements 

Client: Entreprise and RMG (A13 )Construction JV (this was an Amec /
          McAlpine joint venture)
Duration: Jan 2001 to June 2003
Location: A13 from Canning Town to Movers Lane, East London

                         

Scope of works:

M&A Roarty Construction was the principle sub-contractor on the 
construction of a total of 32 no. sewer diversions and modifications 
to facilitate widening and junction improvements of the existing A13 
between River Road Barking and Canning Town Roundabout. 
This work has been carried out on and around one of the busiest 
arterial roads serving East London, working alongside a
number of other contractors carrying out similar diversions to other 
utilities. 

                               

Major elements of work included:

2100mm diameter surface water sewer diversion.
130m of 2100mm diameter surface water sewer diversion constructed 
by pipejack. 3 No. 14m deep 4.00m diameter bolted segmental 
caisson shafts.

This work was carried out in difficult ground conditions at 11m depth 
at the interphase between sandy gravels overlying clay. Extensive 
dewatering required to successfully complete this scheme. 

Twin 1500mm diameter gas service ducts
2 No 75m lengths of 1500mm concrete pipes installed by pipejack. 
Drives launched from a 7.5 wide x 13.5m long x 10m deep Larsen 
sheet and frame shaft.

This drive was carried out across the busy A13 Newham Way / Prince 
Regent Lane junction to allow installation of 2 no. 1200mm diameter 
high pressure gas mains. Line and level tolerance on these drives was 
critical for the subsequent installation of the twin gas mains and was 
maintained to within +/- 30mm.

1650mm foul sewer diversion
The installation by open cut of 500m of 1650mm foul sewer at an 
average depth of 4.0m within existing carriageway and parkland. 

Construction of 7No manholes ranging from 2.4 to 4.0m diameter.

1200mm Pipejack Crossings

Construction of 3 No 1200mm diameter sewers crossing the A13 adjacent 
to the Prince Regent Lane diversion. These crossings (ave length 35m) 
were each constructed by pipejack from sheet and frame shafts at 
approximately 4.0m depth. 

Extensive traffic management was required to ensure safe working 
around the shafts and each of the drives required establishment 
of dewatering systems. 

Noel Road Culvert

The relining and strengthening of a 60m length of existing 
1600mm wide x 1200mm trapezoidal culvert passing beneath the 
A13 in Newham. The existing culvert is constructed with approximately 
500mm of cover beneath the carriageway and required upgrading to 
meet the new requirements of Transport for London.

Work included cleaning out of existing culvert, scabbling of soffit and 
installation and grouting of precast GRP structural liner units.

Northern Outfall Sewer Cloughs

Construction of new cloughs in each of the barrels of the Northern 
Outfall Sewer (NOS). The NOS consists of 5No. 2.7m diameter brick 
built sewers serving Beckton STW. Installation of the cloughs required 
management of major flow diversions within the system to successfully 
complete the works.

Barking Reach Rising Main

The installation in 2.5m deep open cut of 600m of 630mm OD MDPE 
butt fusion welded rising main and construction of associated 
wash out and air release chambers.

This scheme also involved the management of installation of 60m of 
600mm ID microtunnel to connect into an existing brick built Trunk 
Sewer within the A13 Alfreds Way. 


Despite very demanding programming schedules and the complexities 
of working in such congested locations, work to date on these contracts 
has been successfully completed to the satisfaction of both the client 
and TWUL, to programme and to budget
                                          

back to top

button; link to our Frimley excavation project page
button; link to our Grove Vale project page
button; link to our A13 project page
aying project page
button; link to our Moorgate project page

 

 


M&A Roarty Construction™, roartyconstruction.com™, & roartyconstruction.co.uk™ are registered trademarks. Site content ©2005-2007.
All Rights Reserved Rocket Web Design.

This site has been produced by Rocket Web Design.