Carter Drive Flood Alleviation Scheme


Clients: Enterprise and Thames Water 

Duration: 32 weeks 

Location: Carter Drive,Collier Row, Essex

                  

Description of works: 

M&A Roarty Construction, on behalf of Enterprise constructed a 
concrete segmental caisson shaft storage tank, 15m diameter
21m deep.

The project also included: 

Construction of approximately 1350m of 450mm dia. pipe in open
cut at depths to invert of up to 3.0m. 
Construction of approximately 17m of 375mm dia.  pipe in open
cut maximum depth to invert 3.0m. 
Construction of approximately 25 number associated manholes / 
chambers maximum size 2000mm (internal) and maximum depth 3.0m. 
              
                          
                          
                                          

back to top

button; link to our Frimley excavation project page
button; link to our Grove Vale project page
button; link to our A13 project page
button; link to our DMR Main Laying project page
button; link to our Moorgate project page

 

 


M&A Roarty Construction™, roartyconstruction.com™, & roartyconstruction.co.uk™ are registered trademarks. Site content ©2005-2007.
All Rights Reserved Rocket Web Design.

This site has been produced by Rocket Web Design.